OOI Installed and planned cables and sensors (2012)

OOI Installed and planned cables and sensors (2012)

Installed and planned cable and sensor installation at the Endeavour node of the Canadian NEPTUNE high-power and high-bandwidth cabled observatory. Full installation will be completed in 2012 (http://www.neptunecanada.ca/). The University of Washington is installing the US companion system at Axial Seamount as part of the National Science Foundation Ocean Observatory Initiative (http://www.interactiveoceans.washington.edu/story/Observatories+Index; http://www.oceanobservatories.org/infrastructure/ooi-components/regional...) and will be operational in 2013, with commissioning in 2014.
Species (common):
Year: 2012
Details:
Media Type: Map
Data Type:
Device Type:
Feature: JdF
Investigator: Deborah Kelley
Expedition:
Chief Scientist:
Species: